Project IQ-P1001 Small hand pump well 24 km from Khanpur Mahar, in Pakistan
On the sign: “أم عبد الله”
- Funded on
- Completed on
- Completed in 5 days
Photos and videos of the work
Checked by our team · 37 photos · 20 videos
- Verified projectEvery photo and video is checked by our team before it is published.
- Authentic signA unique QR code links the sign on site to this page.
- Local partnerCarried out by our partner in the field, close to the community.
- Dated follow-upEvery step is dated, from the funding to the photos.
The customer's review
« I am extremely satisfied with this organization. Everything was done with great seriousness, transparency and professionalism, from the beginning until the completion of the well. We are kept informed (photos, videos etc.), you can see that things are well organized and above all, you can feel that there is a genuine concern to do things properly! That comes through a lot. It is truly reassuring to be able to entrust such an important project to a trustworthy organization, especially when it is intended to be a cause for people to access and benefit from drinking water. A big thank you to the whole team for your work, your seriousness and your commitment. May Allah reward you abundantly for your efforts, place baraka in your work and make this well a source of blessings for all who will benefit from it bi idnillah. I sincerely recommend this organization Allahuma barik! »Translated from French · Show original
« Je suis extrêmement satisfaite de cette organisation. Tout a été fait avec beaucoup de sérieux, de transparence et de professionnalisme, du début jusqu’à la réalisation du puits. On est informé (photos, vidéos etc..), on voit que les choses sont bien organisées et surtout, on sent qu’il y a un vrai souci de bien faire les choses! Ça se ressent énormément. C’est vraiment rassurant de pouvoir confier un projet aussi important à une organisation de confiance, surtout quand c’est dans le but d’être une cause pour que des personnes puissent accéder et bénéficier d’eau potable . Un grand merci à toute l’équipe pour votre travail, votre sérieux et votre implication. Qu’Allah vous récompense abondamment pour vos efforts, mette la baraka dans votre travail et fasse de ce puits une source de bienfaits pour tous ceux qui en profiteront bi idnillah. Je recommande sincèrement cette organisation Allahuma barik ! »
The well's sign
Fixed on the well, with a QR code leading to this page.
Did you scan this QR code? You are in the right place: this project is authentic and verified by Ihsan Quest.
أم عبد الله
Project no.IQ-P1001
Date10/2026
Where this project is
Satellite view of the location recorded by our partner on site.
Around the project
What public data says about the place where it was carried out.
- Nearest town: Khanpur Mahar, 24 km
- 200 mm of rain a year10 dry months a year
- Up to 43 °Caverage afternoon high in May
- 66 mabove sea level
Sources: Open-Meteo, 2016–2025 average · © OpenStreetMap contributors. Public data, for information only.
About this project
This well (Small hand pump) was funded on Ihsan Quest on 23 October 2026, then built in Pakistan by our local partner and finished on 28 October 2026. The name “أم عبد الله” appears on its sign. From funding to completion: 5 days.
The nearest town, Khanpur Mahar, is 24 km away. It gets 200 mm of rain a year on average, with 10 dry months a year.
A hand pump installed on a borehole: water is drawn by hand, with no electricity needed. Simple and sturdy equipment for everyday access to water.
Before publishing the photos and videos, our team checks them one by one: what you see here was really done.
Water every day, close to home
This hand pump is installed in Pakistan, close to people's homes, and can serve up to 50 people. No more long trips to fetch water: people drink, cook and perform their ablutions on site, with no electricity needed.
Project history
- Project completedThe photos and videos of the work are checked and published.
- Work in progressOur partner is carrying out your project in the field.
- Project preparationOur partner is organising the work: team, equipment and access to the site.
- Project handed over to our partnerOur partner on site has received and accepted your project.
- Project reviewOur team checks your project before handing it over to our partner on site.
- Funding receivedThe payment is confirmed.




